NGL Energy Partners Announces Commissioning of Poker Lake Express Pipeline
(P&GJ) — NGL Energy Partners has begun receiving produced water from XTO Energy’s Poker Lake Development in the Delaware Basin.
These volumes represent full commissioning of NGL’s 30-inch pipeline, Poker Lake Express, which has been constructed to transport volumes associated with its 18-year Poker Lake acreage dedication.
This dedication includes first-call rights for produced water covering approximately 70,000 contiguous acres in Eddy County, NM.
The Partnership is utilizing the new Poker Lake Express Pipeline, which has an initial capacity of over 350,000 barrels per day and connects into its integrated Delaware Basin produced water pipeline infrastructure network.
The Partnership expects to expand its takeaway capacity with an additional pipeline as the Poker Lake Development progresses, ultimately increasing total takeaway capacity to over 700,000 barrels per day from this development.
“We are pleased to announce first flows from Poker Lake, which represents a major milestone for our Water Solutions business,” said Christian Holcomb, Senior Vice President and Chief Operating Officer, NGL Water Solutions.
NGL owns and operates the largest integrated network of large diameter produced water pipelines, recycling facilities and disposal wells in the Delaware Basin.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- Enbridge to Invest $500 Million in Pipeline Assets, Including Expansion of 850-Mile Gray Oak Pipeline
- MEG Energy Confirms Trans Mountain Pipeline Expansion to Begin Line Fill in April
Comments