Texas Intrastate Whistler Pipeline Placed in Service
The Whistler Pipeline began full commercial service on July 1, providing approximately 2.0 billion cubic feet per day (Bcf/d) of incremental natural gas transport capacity to the Texas Gulf Coast markets from the Permian basin, which will help ensure sufficient reliable gas takeaway and reduce natural gas flaring in the Permian basin. The delivery points in the Agua Dulce provide shippers with access to Gulf Coast industrial and export markets including LNG.
The Whistler Pipeline is 100% owned by Whistler Pipeline LLC, which is a consortium made up of MPLX LP, WhiteWater Midstream and a joint venture between Stonepeak Infrastructure Partners and West Texas Gas, Inc.
The Whistler Pipeline is an approximately 450-mile, 42-inch intrastate pipeline that transports natural gas from the Waha Header in the Permian Basin to Agua Dulce, Texas, providing direct access to South Texas and export markets. An approximately 50-mile 36-inch lateral provides connectivity to the Midland Basin.
Related News
Related News

- Repsol Ditches Plans to Develop LNG Terminal on Canada’s East Coast
- Kazakh Oil Decouples from Russian Crude But Risk Weighs on Price
- Pipeline Operator TC Energy Says Stress, Weld Fault Caused Keystone Oil Spill
- US to Sell 26 Million Barrels of Oil Reserves As Mandated by Congress
- Ukraine to Jointly Buy Gas with European Union Countries
- Company Cancels Byhalia Connection Pipeline Project
- US Intelligence Suggests Pro-Ukrainian Group Sabotaged Nord Stream Pipelines -NYT
- EIA: US Natural Gas Output to Hit Record High in 2023, Demand to Fall
- US Regulator Orders Lower Pressure on Keystone Pipeline System After Spill
- US Carbon Pipeline Faces Setback as Residents Refuse to Cede Land Rights
Comments