Libya’s Waha Oil Loses 115,000 bbl/d Due to Pipeline Maintenance
8/14/2024
(Reuters) — Libya's Waha oil company's production was reduced by 115,000 barrels per day due to maintenance on the pipeline pumping oil from the Waha field to Es Sider port, a company source told Reuters on Wednesday.
The company's production capacity is about 300,000 bpd, which is exported through Es Sider terminal.
"The maintenance is expected to be completed within two days," the source added.
Waha, a subsidiary of Libya's National Oil Corp (NOC), operates as a joint venture with TotalEnergies and ConocoPhillips.
The company runs five main fields: Waha - which produces more than 100,000 bpd - Gallo, Al-Fargh, Al-Samah, and Al-Dhahra.
Related News
Related News
Sign up to Receive Our Newsletter

- Energy Transfer Wins New York Court Ruling in $150 Million Pipeline Fraud Case
- $3 Billion Natural Gas Pipeline Expansion to Add 1.3 Bcf Capacity in Southeast Region
- Trump Puts Keystone XL Pipeline Back in Discussion, Though Revival Faces Developer Resistance
- Boardwalk Approves 110-Mile, 1.16 Bcf/d Mississippi Kosci Junction Pipeline Project
- Kinder Morgan Approves $1.4 Billion Mississippi Crossing Project to Boost Southeast Gas Supply
- Enbridge Should Rethink Old, Troubled Line 5 Pipeline, IEEFA Says
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
- Phillips 66 to Sell $865 Million Stake in 500-Mile Gulf Coast Express Pipeline to ArcLight
- NDT, Aramco to Launch 56-Inch Inspection Tool
Pipeline Project Spotlight
Owner:
East African Crude Oil Pipeline Company
Project:
East African Crude Oil Pipeline (EACOP)
Type:
TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions.
Length:
902 miles (1,443 km)
Capacity:
200,000 b/d
Start:
2022
Completion:
2025
Comments