Feature
May 2022, Vol. 249, No. 5
27-Day ILI Run: A Case Study of a Low-Pressure, Low-Flow Gathering Line
In 2011, a customer, who was in a difficult situation, approached Pipesurvey International (PSI). The customer had a pipeline that ran from the Q1 Field in the North Sea 52 miles (81 km) off the coast of The Netherlands, to an offshore terminal that needed an in-line inspection (ILI).