Greece's Gastrade Says LNG Terminal on Track with Final Investment Decision
ATHENS (Reuters) — Greece's Gastrade said on Friday a final investment decision had been made on developing a Greek liquefied natural gas (LNG) terminal, the last step before building the project begins.
Gastrade is developing a floating LNG facility off the northern city of Alexandroupolis, with an annual capacity of about 5 billion cubic meters of gas.
The Copelouzos family, GasLog Cyprus Investments, Greek gas utility DEPA Commercial, Greek gas grid operator DESFA and Bulgartransgaz all have stakes in the project, which is expected to start operating by the end of 2023.
Gastrade said in a statement that the shareholders have unanimously approved that all requirements for the project have been secured and it is on track.
The facility will be linked to the Greek gas grid via a 28-kilometre pipeline and carry gas on to Bulgaria and North Macedonia as part of Greece's drive to diversify its gas resources and become an energy hub in southeastern Europe
Related News
Related News
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Kinder Morgan Declares Force Majeure on West Texas Gas Pipeline After Fire
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
- Pipeline Hydro Test Pressure Determination
- Venezuela Proposes Alternative Payment Plan as Weak Bids Surface in Citgo Auction
- Baker Hughes Wins Contract for Huge Aramco Gas Expansion Project
- Japan Looks at Developing Domestic Pipelines Sector
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
Comments