Cleanup of 2013 North Dakota Oil Spill Slowed by Lack of Natural Gas
9/9/2015
BISMARCK, N.D. (AP) — A state regulator said cleanup of a massive 2013 oil spill in northwestern North Dakota is being slowed due to the lack of natural gas needed to power equipment at the site.
State environmental scientist Bill Suess said workers will be at the site near Tioga at least another two years baking oil from the soil using a process called thermal desorption.
Workers are trying to bring a second thermal desorption machine online but there is not enough natural gas available commercially in the area to power the unit. Suess called it “an irony” due to the amount of natural gas in the region that is being flared.
The spill was discovered by a Tioga farmer in September 2013 and has been called the worst in state history.
Related News
Related News
Sign up to Receive Our Newsletter
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Kinder Morgan Declares Force Majeure on West Texas Gas Pipeline After Fire
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
- Pipeline Hydro Test Pressure Determination
- Venezuela Proposes Alternative Payment Plan as Weak Bids Surface in Citgo Auction
- Baker Hughes Wins Contract for Huge Aramco Gas Expansion Project
- Japan Looks at Developing Domestic Pipelines Sector
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
Pipeline Project Spotlight
Owner:
East African Crude Oil Pipeline Company
Project:
East African Crude Oil Pipeline (EACOP)
Type:
TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions.
Length:
902 miles (1,443 km)
Capacity:
200,000 b/d
Start:
2022
Completion:
2025
Comments