Red Butte Pipe Line Announces Open Season
(P&GJ) — Red Butte Pipe Line has announced an open season to solicit shipper commitments for the refurbishment and overhaul of a Wyoming pipeline.
The pipeline runs 8 miles between the Red Butte Gebo Station located in Hot Springs County, Wyoming to Chatham Station located in Washakie County, Wyoming.
Upon a showing of significant shipper interest, the Pipeline Project will be capable of providing up to 5,000 barrels per day of transportation service for petroleum meeting the Carrier’s common stream (API gravity between 30º and 50º, with an upper sulfur content limit of 0.42%).
The deadline for submitting bids in the open season is September 7, 2020 but may be extended at Carrier’s sole discretion.
Red Butte is a 495-mile crude oil pipeline system across the Big Horn and Wind River Basins.
Red Butte is currently the largest pipeline gathering asset transporting crude oil out of the Big Horn and Wind River Basins to Casper, Wyoming.
The system has two delivery points, multiple truck loading stations, and over 800,000 barrels of storage along the system.
For additional information, please visit www.scmidstream.com.
Related News
Related News
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Kinder Morgan Declares Force Majeure on West Texas Gas Pipeline After Fire
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
- Pipeline Hydro Test Pressure Determination
- Venezuela Proposes Alternative Payment Plan as Weak Bids Surface in Citgo Auction
- Baker Hughes Wins Contract for Huge Aramco Gas Expansion Project
- Japan Looks at Developing Domestic Pipelines Sector
- Enbridge Picks Contractors for Great Lakes Tunnel Project, Securing Line 5 Pipeline Route
Comments