Entergy Seeks to Build NatGas/Hydrogen Power Plant in Texas
(Reuters) — U.S. electric company Entergy Corp wants to build a power plant in Texas capable of burning a combination of natural gas and hydrogen as more consumers seek to transition from dirty fossil fuels to carbon-free sources of energy.

This is just one of several hydrogen projects that U.S. utilities are developing. But before hydrogen can displace fossil fuels, analysts say governments need legislation and regulation to push energy firms to spend the billions needed to reduce the cost of producing clean or green hydrogen.
Entergy said in a release on Thursday that its proposed 1,215-megawatt (MW) Orange County plant will be located near Bridge City, which is close to the Gulf Coast near the Texas-Louisiana border.
Hydrogen, which produces no carbon dioxide emissions, is already used by several of Entergy's large industrial customers and can be stored nearby in facilities like Entergy Texas's Spindletop storage facility.
Most of that hydrogen, like most produced around the world, comes from fossil fuels so is not considered green hydrogen, which comes from non-carbon-emitting sources.
"Our region is home to hydrogen producers, pipelines, storage and industrial users," Sallie Rainer, president and chief executive of Entergy Texas, said in the release.
Construction of the plant will provide more than 7,000 direct jobs and nearly $1.8 billion in economic activity to the regional economy. Once operating, it will provide about 27 direct jobs and be capable of producing enough power for more than 230,000 homes.
Entergy said in coming months it intends to seek approval to build the plant from the Public Utility Commission of Texas. If the PUC approves the application, Entergy said it will start construction in the second quarter of 2023 with the plant expected to enter service by the summer of 2026.
Related News
Related News

- Kazakh Oil Decouples from Russian Crude But Risk Weighs on Price
- Repsol Ditches Plans to Develop LNG Terminal on Canada’s East Coast
- Pipeline Operator TC Energy Says Stress, Weld Fault Caused Keystone Oil Spill
- US to Sell 26 Million Barrels of Oil Reserves As Mandated by Congress
- Ukraine to Jointly Buy Gas with European Union Countries
- Company Cancels Byhalia Connection Pipeline Project
- US Intelligence Suggests Pro-Ukrainian Group Sabotaged Nord Stream Pipelines -NYT
- EIA: US Natural Gas Output to Hit Record High in 2023, Demand to Fall
- US Regulator Orders Lower Pressure on Keystone Pipeline System After Spill
- US Carbon Pipeline Faces Setback as Residents Refuse to Cede Land Rights
Comments